lagen.nu
AMC and GM to Annex IV (Part-CAT) to Commission Regulation (EU) No 965/2012 — Issue 2, Amendment 22

AMC and GM to Annex IV (Part-CAT) to Commission Regulation (EU) No 965/2012 — Issue 2, Amendment 22

Utgivare
Europeiska unionens byrå för luftfartssäkerhet
Antagen
2022-08-19
Utfärdat genom
ED Decision 2022/014/R
Språk
engelska
Ämnesord
Part-CAT - Commercial Air Transport Operations
Källa
www.easa.europa.eu
Endast på engelskaEuropeiska unionens byrå för luftfartssäkerhet har inte publicerat någon svensk version av detta dokument. Texten nedan återges på engelska, så som den publicerats av Europeiska unionens byrå för luftfartssäkerhet.

Annex II to ED Decision 2022/014/R ‘AMC & GM to Annex IV (Part-CAT) to Commission Regulation (EU) No 965/2012 — Issue 2, Amendment 22’

The text of the amendment is arranged to show deleted, new or amended text as shown below: (a) deleted text is struck through; (b) new or amended text is highlighted in blue; (c) an ellipsis ‘[...]’ indicates that the rest of the text is unchanged.

Note to the reader

In amended, and in particular in existing (that is, unchanged) text, ‘Agency’ is used interchangeably with ‘EASA’. The interchangeable use of these two terms is more apparent in the consolidated versions. Therefore, please note that both terms refer to the ‘European Union Aviation Safety Agency (EASA)’.

The Annex to Decision 2014/015/R of 24 April 2014 of the Executive Director of the Agency is amended as follows:

GM1 CAT.OP.MPA.101(b) Altimeter check and settings

The following paragraphs of ICAO Doc 8168 (PANS-OPS), Volume III provide recommended guidance on how to develop the altimeter setting procedure:

(a) 3.2 ‘Pre-flight operational test’;

(b) 3.3 ‘Take-off and climb’;

(c) 3.5 ‘Approach and landing’.

AMC5 CAT.OP.MPA.110 Aerodrome operating minima

(a) […]

(b) […]

(c) […]

(d) […]

Table 10

Visual and non-visual aids and/or on-board equipment versus minimum RVR — aeroplanes

(…)

AMC11 CAT.OP.MPA.110 Aerodrome operating minima

[…]

(b) Conditions applicable to Table 17:

(1) multiple failures of runway/FATO lights other than those indicated in Table 17 should not be acceptable;

(2) deficiencies failures of approach and runway/FATO lights are acceptable at the same time, and the most demanding consequence should be applied; and

(3) failures other than ILS, GLS, MLS affect the RVR only and not the DH.

[…]

AMC1 CAT.OP.MPA.115(a) Approach flight technique — aeroplanes

[…]

(g) The operator should specify the following in the operations manual:

(1) the acceptable tolerances referred to in (d);

(2) the means to identify the predetermined points referred to in (a) and (b). This should normally be the FAF.

(fh) When the operator requests approval for an alternative to the stabilised approach criteria for a particular approach to a particular runway, the operator should demonstrate that the proposed alternative will ensure that an acceptable level of safety is achieved.

AMC1 CAT.OP.MPA.140(d) Maximum distance from an adequate aerodrome for two-engined aeroplanes without an ETOPS approval

[…] (h) Dispatch/flight planning rules […] (4) ERA aerodrome(s): the operator should ensure that ERA aerodromes are available for the intended route, within the distance flown in 180 minutes based upon the OEI cruising speed, which is a speed within the certified limits of the aeroplane, selected by the operator and approved by the competent authority, confirming that, based on the available meteorological information, the weather conditions at ERA aerodromes are at or above the applicable minima for the applicable period of time, in accordance with CAT.OP.MPA.1825. […]

AMC9 CAT.OP.MPA.182 Fuel/energy scheme — aerodrome selection policy — aeroplanes

(a) Variations to the basic fuel schemes in the selection of aerodromes in regard to the planning minima are methods to reduce the meteorological margins based on the established mitigating measures. (b) As a minimum, the operator should: (1) use a suitable computerised flight-planning system; (2) hold an approval for limitedlow-visibility approach operations for that fleet; and (3) have established an operational control system that includes flight monitoring. […]

AMC2 CAT.OP.MPA.312(a)(2) EFVS 200 operations

The operational assessment before authorising the use of a runway for EFVS 200 operations should be conducted as follows: (a) Check whether the runway has been promulgated as suitable for EFVS operations or is certified as a precision approach runway category II or III by the State of the aerodrome. If this is so, then check whether and where the approach and runway lights installed (notably incandescent or LED lights) are adequate for the EFVS equipment LED lights are installed in order to assess the impact on the EFVS equipment used by the operator.

(b) If the check in point (a) above comes out negative (the runway is not promulgated as EFVS suitable or is not category II or III), then proceed as follows: (1) For straight-in IAPs, US Standard for Terminal Instrument Procedures (TERPS) may be considered to be acceptable as an equivalent to PANS-OPS. If other design criteria than those in PANS-OPS or US TERPS are used, the operations should not be conducted. (2) If an OFZ is established, this will ensure adequate obstacle protection from 960 m before the threshold. If an OFZ is not established or if the DH for the approach is above 250 ft, then check whether there is a visual segment surface (VSS). (3) VSSs are required for procedures published after 15 March 2007, but the existence of the VSS has to be verified through the aeronautical information publication (AIP), operations manual Part C, or direct contact with the aerodrome. Where the VSS is established, it may not be penetrated by obstacles. If the VSS is not established or is penetrated by obstacles and an OFZ is not established, then the operations should not be conducted. Note: obstacles of a height of less than 50 ft above the threshold may be disregarded when assessing the VSS. (4) Runways with obstacles that require visual identification and avoidance should not be accepted. (5) For the obstacle protection of a balked landing where an OFZ is not established, the operator may specify that pilots follow a departure procedure in the event of a balked landing, in which case it is necessary to verify that the aircraft will be able to comply with the climb gradients published for the instrument departure procedures for the expected landing conditions. (6) Perform an assessment of the suitability of the runway which should include whether the approach and runway lights installed (notably incandescent or LED lights) are adequate for the EFVS equipment used by the operator. (c) If the AFM stipulates specific requirements for approach procedures, then the operational assessment should verify that these requirements can be met.

Fotnoter

  1. AMC & GM to Part-CAT
  2. Issue 2, Amendment 22
  3. Annex II to ED Decision 2022/014/R Page 1 of 5
  4. AMC & GM to Part-CAT
  5. Issue 2, Amendment 22
  6. ALTIMETER SETTING PROCEDURES
  7. DETERMINATION OF RVR OR VIS FOR INSTRUMENT APPROACH OPERATIONS — AEROPLANES
  8. Lowest RVR Type of Facilities approach Multi-pilot Single-pilot operations operations
  9. 3D runway touchdown zone lights (RTZL) and runway No limitation operations centre line lights (RCLL) Final without RTZL and RCLL but using HUDLS or approach equivalent system; coupled autopilot or flight No limitation 600 m track offset director to the DH o 15 for category A and B aeroplanes o No RTZL and RCLL, not using HUDLS or equivalent or 5 for 750 m 800 m system or autopilot to the DH Category C and D aeroplanes 3D runway touchdown zone lights (RTZL) and runway operations centre line lights (RCLL) 800 m 1 000 m and
  10. Annex II to ED Decision 2022/014/R Page 2 of 5
  11. AMC & GM to Part-CAT
  12. Issue 2, Amendment 22
  13. o Final approach track offset  15 for Category A and B o aeroplanes or Final approach track offset  5 for Category C and D aeroplanes without RTZL and RCLL but using HUDLS or equivalent system; autopilot or flight director to the DH and 800 m 1 000 m o Final approach track offset  15 for Category A and o B aeroplanes or Final approach track offset  5 for Category C and D aeroplanes o 2D Final approach track offset 15 for category A and B o 750 m 800 m operations aeroplanes or 5 for Category C and D aeroplanes o Final approach track offset  15 for Category A and 1 000 m 1 000 m B aeroplanes o Final approach track offset  5 for Category C and D 1 200 m 1 200 m aeroplanes
  14. EFFECT ON LANDING MINIMA OF TEMPORARILY FAILED OR DOWNGRADED GROUND EQUIPMENT
  15. STABILISED APPROACH OPERATIONS — AEROPLANES
  16. Annex II to ED Decision 2022/014/R Page 3 of 5
  17. AMC & GM to Part-CAT
  18. Issue 2, Amendment 22
  19. BASIC FUEL SCHEME WITH VARIATIONS — PLANNING MINIMA
  20. VERIFICATION OF THE SUITABILITY OF RUNWAYS FOR EFVS 200 OPERATIONS
  21. Annex II to ED Decision 2022/014/R Page 4 of 5
  22. AMC & GM to Part-CAT
  23. Issue 2, Amendment 22
  24. Annex II to ED Decision 2022/014/R Page 5 of 5