No L 113 / 14 Official Journal of the European Communities 28.4.73

REGULATION (EEC) No 1069/73 OF THE COMMISSION

of 16 March 1973

applying Council Regulation (EEC) No 1056/72 of 18 May 1972 on notifying the

Commission of investment projects of interest to the Community in the petroleum,

natural gas and electricity sectors

THE COMMISSION OF THE EUROPEAN Whereas to simplify the transmission of information

COMMUNITIES, and to ensure that statistics are comparable, notifi­

cations to be made by Member States and under­

Having regard to the Treaty establishing the Eu­ takings should be standardized by the use of ques­

ropean Economic Community ; tionnaires which would serve as a guide for the

presentation and content of such notifications;

Having regard to Council Regulation (EEC) No HAS ADOPTED THIS REGULATION : 1056/72 (*) of 18 May 1972 on notifying the Com­

mission of investment projects of interest to the Article 1 Community in the petroleum, natural gas and elec­

tricity sectors, and in particular Article 2 (2) thereof; The notifications referred to in Article 1 of Regu­

lation (EEC) No 1056/72 shall be drawn up as shown Whereas Article 2 (2) of Regulation , (EEC) No in the Annex to this Regulation.

1056/72 provides that the Commission may, within

the limits laid down by that Regulation and the Article 2

Annexes thereto, adopt implementing provisions con­

cerning the form, content and other details of the This Regulation shall enter into force on the day

notifications provided for in Article 1 of that Regu­ following its publication in the Official Journal of

lation ; the European Communities.

This Regulation shall be binding in its entirety and directly applicable in all Member

States .

Done at Brussels, 16 March 1973 .

For the Commission

The President

Francois-Xavier ORTOLI

(») OJ No L 120, 25 . 5. 1972, p. 7.

28 . 4. 73 Official Journal of the European Communities No L 113/15

CONFIDENTIAL

QUESTIONNAIRE

to be submitted

(a) by companies to the Governments of the Member States

(b) by the Member States to the Commission of the European Communities

Establishing of the implementing provisions pursuant to Article 2 (2) of Council Regu­

lation (EEC) No 1056/72 of 18 May 1972 on notifying the Commission of investment

projects of interest to the Community in the petroleum, natural gas and electricity sectors

DEFINITIONS

The following shall be considered as 'investment projects':

The decision in principle to construct or enlarge an installation or part installation (within the meaning of the Annex to Council Regulation (EEC) No 1056/72), taken under a financial plan covering a number of years for investments, the realization of which must normally begin within three years.

The following shall be considered as 'proposed withdrawals from service':

The decision in principle to withdraw from service an installation or a part installation (within the meaning of the Annex to Council Regulation (EEC) No 1056/72), this decision normally being put into effect within three years.

TIME LIMITS :

1 . To be communicated by persons and companies to the Member States before 15 January of each year.

2. To be communicated by the Governments of the Member States to the Commission of the European Communities before 15 February of each year.

(If there is insufficient room on the forms, additional information may be included on separate sheets.)

No L 113 / 16 Official Journal of the European Communities 28. 4. 73

P 1

INVEST

8

Remarks

. .. 19

or/ 1January : (nature and ) of oil as State 7 material crude feedstocks raw the of Position Member Input /

after

000 completed ) 6 is 000 capacity /year 1 (t of SECTOR Expected /

construction plants capacity a

) )with more capacity processing (1 5 PETROLEUM or /year ,(t . THE stage plants year Nominal t/ /

IN 1st / ­ excluded ) /

,are 4 (year distillation service ns Refining date ing Commission from ­ by-products as Proposed work INVESTMENTS 3 of ) installatio only Atmospheric (2 Withdrawals Commence ment ) part them (2 or /

produce

installations 2 which : or Location construction part , installations or of fuels

• . under motor year installations /or t/ service undertakings and 000 or part installations from oil 000 or 1 installations for fuel

persons part beyond

or produce the 1 projects installation not of withdrawals capacity the installations do

of

which address Name Existing Installations Investment Proposed distillation plants of and A. B. C. D.

Name 1 2 3 4 5 Chemical Extension ) ) (l (2

28 . 4. 73 Official Journal of the European Communities No L 113/17

F 2

INVEST

. 9 ..

19 Remarks

1January :

of as State

Position Member

) capacity 8 /day 500 construction (t completed of

Expected after SECTOR /

plants capacity a y 7 capacity //da 7

with . (t

processing ).. Nominal (1 more PETROLEUM or ­ ,etc . / /

THE day 6 t/ ing service IN plants date Commission from excluded /downstream ­ ,are work 5 Proposed of /cracking products Refining Commence Withdrawals . ment by etc ­ as ), INVESTMENT ) 4 (2 / /

ing installations only Crack Reforming ­ processes part / them

3 Processing methods ing or /

Reform produce cracking /

installations which special : 2 construction part ,or (as Location installations or fuels of under motor visbreaking installations or service /or undertakings and or part installations from oil or installations for ,catalytic fuel

persons part thermal

1 installation or produce the projects ,eg the not of withdrawals of installations do

processes Name which address Existing Installations Investment Proposed plants technical and of A. B. C. D.

Name 1 2 3 4 5 Chemical Details ) ) ( (2

No L 113 / 18 Official Journal of the European Communities 28.4.73

P 3 14

INVEST Remarks

of 13 Point arrival

Branches of 19 12

Point departure

January 1 :

of ) 11 (3 as State date date ) Maximum

capacity year commissioning commissioning 1/ reference of of reference 06 Positions Member (1 the time time the 10 Transport At At Normal the the At At

of

2) 9 capacity /cm length a Working pressure (kg .

SECTOR have 2) planned excluded

or 8 /cm )are which long Nominal pressure (kg form km and this installed 30 of PETROLEUM ) an 7 year t/ (cm page Transport than Internal diameter THE the with of . IN ) 000 less (1 ) (J ) end 000 not 6 the 3 (km pressures at Length pipelines than ­ ) working oil footnote less /or 5 (year service see installations 1( and INVESTMENTS not date ning Commissio from P Crude of ­ part work form / or

4 Proposed of of diameters ns

Commence ment Withdrawals scope installations variable the : / by .).

of 3 construction part installatio ,etc Point arrival or of outside pipelines marked under is the plants of installations of service ,temperature undertakings 2 pipelines or Route Point part installations departure from supplying the or viscosity installations for of those (eg persons part route and used the or the projects of withdrawals installations purposes where 1 installation parameters the of routes address military Existing Installations Investment Proposed for part average and Name the A. B. C. D.

Name Pipelines Including State 1 2 3 4 5 ) ) ) ( (2 (3

28 . 4. 73 Official Journal of the European Communities No L 113 /19

- F 4 15

INVEST Remarks

the to of 14 transported Nature products be . ..

19 of 13 Point arrival

January Branches of 1 : 12 of Point State departure as

) (3 Position Member 11 date date ) Maximum

capacity year t/ commissioning commissioning . a 3 reference of of reference (10 the the time time have At excluded 10 the the At planned Transporting Normal are At At ) or SECTOR which form

2) this and 9 km /cm of installed 30 Working pressure (kg an year page t/ the than 2) of PETROLEUM )with 000 8 /cm (1 less end Nominal pressure (kg 500 1 the THE Transport not at of . IN pipelines than 7

Internal diameter footnote less length pressures

) (see not (2 1 product ) P of 6 (km working form Length /or of INVESTMENTS ­ ) installations and Petroleum capacity scope 5 (year part from the date Commissio ning or diameters ­ service outside work 4 Proposed of installations Withdrawals variable plants .). : Commence ment by construction part ,etc installations of / or

3 of marked arrival under is Point exclusively pipelines the installations ,temperature undertakings service of of pipelines or 2 part installations supplying the or from viscosity Route Point of departure for installations those (eg persons and route part used the the or projects of withdrawals installations purposes where

1 installation parameters the routes address military of Existing Installations Investment Proposed part for average and Name the A. B. C. D.

Name Pipelines Including State 1 2 3 4 5 ) ) ) (1 (2 (3

No L 113/20 Official Journal of the European Communities 28 . 4. 73

F 5

INVEST

9

Remarks

.

. noted .. be to 19

also

are 8 January 3 1 : )m Petroleum products (2 refineries of at as State

Capacity oil 7 Position Member installations Crude

Storage ).

form 6 ) this products Petroleum products of (1 3 reservoir SECTOR m of page / the

000 oil of petroleum 5 Number 100 end

and Crude the than at oil PETROLEUM less /

/Distribution footnote THE crude not )

4 of (see IN (year Supply service date Commissioning storing from capacity excluded for a are Proposed 1 3 P work with Withdrawn of form INVESTMENTS of Commencement installations Installations scope / part

the or

outside 2 installations only Location : construction part installations .). or plants of ,etc under

installations supplying service undertakings part installations those ,temperature or or from installations for and

gravity persons part installation or purposes 1 projects specific .the of the installations withdrawals (eg

of military used for Name address Existing Installations Investment Proposed

and intended parameters A. B. C. D.

Tanks State Name 1 * 2 3 4 5 ) ) (1 (2

28 . 4. 73 Official Journal of the European Communities No L 113 /21

.

1 G 16

INVEST Remarks

f) /m

15 calorific (Kcal

Gross value transported

gas 19 ) / /

14 Natural (origin Description January 1 of / /

and as State arrival 13 departure of of

Extension lengthenings Point Point Position Member . 1 capac / .

12 hour ''m stage per 10 Max. in final the / by-products

length 11 a hour as capacity At Maximum per SECTOR transporting only a have /

them 10 year date date GAS transporting with capacity per which Maximum

rence issioning km produce (') and reference refe 30 coram commissioning 9 Maximum hour the the At At which year per At At NATURAL than Maximum ,or installations Transport of 2) less THE 107mV 8 . /cm products not IN Pressure (kg than of energy pressures extensions less ) 7 or (cm not Internal diameter produce of operating not ) ) do /or 6 (2 (km and INVESTMENTS Length installations Installations capacity which

­ ) part 5 or plants diameters (year date ing Commission installations service ­ withdrawals chemical variable work of by 4 part from : Proposed of construction or installations Date

Commence ment of supplying marked under is

those 3 arrival installations of service undertakings and pipelines part installations or pipeline Point from the or for the installations of purposes of of part route persons 2 Route or military the Point projects the departure withdrawals for of installations where

pipelines routes the address 1 Existing Installations Investment Proposed of gas part

and Name installation A. B. C. D.

1 2 Excluding Including Name 3 4 5 ) ) (1 (2

No L 113/22 Official Journal of the European Communities 28 . 4. 73

2 G

INVEST

-

. 8 ..

Remarks 19

1January

of as State

Position Member

7 LNG Origin of .

gas products

SECTOR natural /

value after 3) GAS /m non-energy 6 gas calorific the (Kcal ) liquefied regasification (1 of produce of Gross do

NATURAL which

Transport capacity THE plants 5 - IN importations

Maximum the date date chemical for regasification

reference reference commissioning commissioning supplying LNG the the storage At At of 3) At those Terminals 4 At (m installations INVESTMENTS and capacity part Maximum or purposes

installations military ) 3 part for construction installations (year or service of Commissioning / from

date under

installations installations service undertakings of Proposed or part installations withdrawals from or of 2 for ,excluding work installations

Date LNC persons part of Commencement or projects the withdrawals of installations

importation

1 the address Investment Proposed Existing Installations for Location and A. B. C. D.

1 Terminals Name 2 3 4 5 ) (1

28.4.73 Official Journal of the European Communities No L 113 /23

3 G

INVEST

10

Remarks

19

3 : 9 m daily January " 1 01 Max. on State

3 8 m6 01 Position Member Useful

7 ^ ­ lO Overall mini a ) (2 SECTOR of with 6 ) gas Type 3( reservoir GAS 6/m 10 natural x /

for 150

NATURAL value ) . of Storage /irf 5 THE facilities calorific (Kcal products

IN capacity

Gross storage mum non-energy

) produce 4 service do INVESTMENTS (year installations Underground from date Commissioning which part ).

or / plants dome

Proposed withdrawals 3 work (salt installations of of chemical Commencement construction part Date cavities : installations or of / under supplying

artificial

those 2 installations service and undertakings Location installations ,aquifers part from or or installations for

purposes deposit part gas

persons or projects military of withdrawals natural for installations

1 installation address the of Installations :exhausted Actual Investment Proposed installations and

Name A. B. C. D. example . Name Excluding For

1 2 3 4 5

No L 113 /24 Official Journal of the European Communities 28 . 4. 73

E 1

INVEST ) the (2 of

10 Remarks vicinity

immediate

the 19 in

located

1January entry : 9 temperature ) of (°C stations as State steam turbine of

at

Design exception Positions Member /

the power the with date date of 1) 03 ,and (1 8 capacity reference reference more (') station commissioning commissioning hardcoal the the SECTOR or At At At Fuel storage At and

MW Total stations products 200 . oil of power 7 for

Type cooling ELECTRICITY only of

capacity thermal a THE ) 6 sets required ;method IN (MW are with Nominal capacity per

sets proposed of sets capacity Conventional 5

Number storage capacity identical on Generating INVESTMENTS installations future ) ;data 4 total part fuel (year service or of and date Commissioning from type

installations location each Proposed 3 for : work construction part given of installations Withdrawn line the or Commencement of at

under / separate

installations a service capacity undertakings use

part installations or 2 or from existing installations for ,please Location

persons part plants or applicable the s projects . stallations withdrawals power of in :where refinery or 1 installation multi-fuel address desired the Existing Installation Investment Proposed of mine

of and case A. B. C. D. the Name In supplying Information Name 1 2 3 4 5 ) ) (1 C

28 . 4. 73 Official Journal of the European Communities No L 113/25

E 2

INVEST linked

14 ,being «

Remarks example

;for

unit . ­ .. capa ) single 19 the a 13 of storage pumps (MW city Nominal constitutes 1January : )

of 12 State Storage (GWh station as capacity the

­ ) (2 which Position Member 11 of produ )from Pumped water

annual (GWh distance ty

10 short cibili flow a Average Natural

more over

SECTOR or )

9 sets system MW capacity per (MW Nominal 50 whole stations of the

8 for

sets Number identical ELECTRICITY power of generating capacity a applicable THE ) 7 IN with head (m where Maximum Hydroelectric plant ) capacity flow 6 characteristics (mVs total

Maximum usable Generating future INVESTMENTS installations Hydraulic ) . 5 C part Category proposed or storage . and ­ ) 4 installations (year ,pumped pumps service installed : date ing construction the Commission part installations from of ­ or . of already work under 3 Proposed of period parallel installations ,run-of-the-river in Commence service Withdrawn capacity ment or undertakings part installations storage utilization total or and from ; series or /

course installations in 2 for

annual Location water part influence ,either persons or ,short-term the projects withdrawals proposed of installations storage reservoir

from downstream installation single 1 a address the :seasonal to Existing Installations Investment Proposed derived desired of and Name A. B. C. D. example

For Production Indications hydraulically Name 1 2 3 4 5 ) ) ) ( (2 (3

No L 113 /26 Official Journal of the European Communities 28 . 4. 73

E 3

INVEST 15

Remarks

­ )

14 trans (MVA Final

19 thermal ­ ­ capacity refer date 13 ing ing the Maximum mission ence commission commission January At 1 : At At

of as State 12

Material

Position Member phase

per 2) 11 conductor (mm

Cross-section per

Conductors

voltage 10 a Number

SECTOR for

9 for Pylons circuits designed designed

of ­ ­ more ­ ­ been or refer ELECTRICITY refer date date 8 Number ing ing the kV the have ence commission commission ence At At THE Transport At At 345 IN they of if 7 for Pylons lines kV designed

­ ­ ­ ­ Voltage refer refer 6 date date ing ing the the ence commission commission ence . At installations At INVESTMENTS At (') At Transmission pylons of part ) (') 5 line or the (km existing Length on

­ ) installations more or : 4 (year construction part installations service kV date ing or Commission of 345 from of ­ under

Proposed work 3 installations of service voltage undertakings a part Withdrawn or Commence ment installations with from or installations for / cables

the persons 2 part triple

or the Linking stations projects new between withdrawals of of installations

the installation address Investment 1 of Existing Installations Proposed the and Name installation C. D. A. B. covers

Name 1 2 3 4 5 Also (')