31973R1069
No L 113 / 14 Official Journal of the European Communities 28.4.73
REGULATION (EEC) No 1069/73 OF THE COMMISSION
of 16 March 1973
applying Council Regulation (EEC) No 1056/72 of 18 May 1972 on notifying the
Commission of investment projects of interest to the Community in the petroleum,
natural gas and electricity sectors
THE COMMISSION OF THE EUROPEAN Whereas to simplify the transmission of information
COMMUNITIES, and to ensure that statistics are comparable, notifi
cations to be made by Member States and under
Having regard to the Treaty establishing the Eu takings should be standardized by the use of ques
ropean Economic Community ; tionnaires which would serve as a guide for the
presentation and content of such notifications;
Having regard to Council Regulation (EEC) No HAS ADOPTED THIS REGULATION : 1056/72 (*) of 18 May 1972 on notifying the Com
mission of investment projects of interest to the Article 1 Community in the petroleum, natural gas and elec
tricity sectors, and in particular Article 2 (2) thereof; The notifications referred to in Article 1 of Regu
lation (EEC) No 1056/72 shall be drawn up as shown Whereas Article 2 (2) of Regulation , (EEC) No in the Annex to this Regulation.
1056/72 provides that the Commission may, within
the limits laid down by that Regulation and the Article 2
Annexes thereto, adopt implementing provisions con
cerning the form, content and other details of the This Regulation shall enter into force on the day
notifications provided for in Article 1 of that Regu following its publication in the Official Journal of
lation ; the European Communities.
This Regulation shall be binding in its entirety and directly applicable in all Member
States .
Done at Brussels, 16 March 1973 .
For the Commission
The President
Francois-Xavier ORTOLI
(») OJ No L 120, 25 . 5. 1972, p. 7.
28 . 4. 73 Official Journal of the European Communities No L 113/15
CONFIDENTIAL
QUESTIONNAIRE
to be submitted
(a) by companies to the Governments of the Member States
(b) by the Member States to the Commission of the European Communities
Establishing of the implementing provisions pursuant to Article 2 (2) of Council Regu
lation (EEC) No 1056/72 of 18 May 1972 on notifying the Commission of investment
projects of interest to the Community in the petroleum, natural gas and electricity sectors
DEFINITIONS
The following shall be considered as 'investment projects':
The decision in principle to construct or enlarge an installation or part installation (within the meaning of the Annex to Council Regulation (EEC) No 1056/72), taken under a financial plan covering a number of years for investments, the realization of which must normally begin within three years.
The following shall be considered as 'proposed withdrawals from service':
The decision in principle to withdraw from service an installation or a part installation (within the meaning of the Annex to Council Regulation (EEC) No 1056/72), this decision normally being put into effect within three years.
TIME LIMITS :
1 . To be communicated by persons and companies to the Member States before 15 January of each year.
2. To be communicated by the Governments of the Member States to the Commission of the European Communities before 15 February of each year.
(If there is insufficient room on the forms, additional information may be included on separate sheets.)
No L 113 / 16 Official Journal of the European Communities 28. 4. 73
P 1
INVEST
8
Remarks
. .. 19
or/ 1January : (nature and ) of oil as State 7 material crude feedstocks raw the of Position Member Input /
after
000 completed ) 6 is 000 capacity /year 1 (t of SECTOR Expected /
construction plants capacity a
) )with more capacity processing (1 5 PETROLEUM or /year ,(t . THE stage plants year Nominal t/ /
IN 1st / excluded ) /
,are 4 (year distillation service ns Refining date ing Commission from by-products as Proposed work INVESTMENTS 3 of ) installatio only Atmospheric (2 Withdrawals Commence ment ) part them (2 or /
produce
installations 2 which : or Location construction part , installations or of fuels
• . under motor year installations /or t/ service undertakings and 000 or part installations from oil 000 or 1 installations for fuel
persons part beyond
or produce the 1 projects installation not of withdrawals capacity the installations do
of
which address Name Existing Installations Investment Proposed distillation plants of and A. B. C. D.
Name 1 2 3 4 5 Chemical Extension ) ) (l (2
28 . 4. 73 Official Journal of the European Communities No L 113/17
F 2
INVEST
. 9 ..
19 Remarks
1January :
of as State
Position Member
) capacity 8 /day 500 construction (t completed of
Expected after SECTOR /
plants capacity a y 7 capacity //da 7
with . (t
processing ).. Nominal (1 more PETROLEUM or ,etc . / /
THE day 6 t/ ing service IN plants date Commission from excluded /downstream ,are work 5 Proposed of /cracking products Refining Commence Withdrawals . ment by etc as ), INVESTMENT ) 4 (2 / /
ing installations only Crack Reforming processes part / them
3 Processing methods ing or /
Reform produce cracking /
installations which special : 2 construction part ,or (as Location installations or fuels of under motor visbreaking installations or service /or undertakings and or part installations from oil or installations for ,catalytic fuel
persons part thermal
1 installation or produce the projects ,eg the not of withdrawals of installations do
processes Name which address Existing Installations Investment Proposed plants technical and of A. B. C. D.
Name 1 2 3 4 5 Chemical Details ) ) ( (2
No L 113 / 18 Official Journal of the European Communities 28.4.73
P 3 14
INVEST Remarks
of 13 Point arrival
Branches of 19 12
Point departure
January 1 :
of ) 11 (3 as State date date ) Maximum
capacity year commissioning commissioning 1/ reference of of reference 06 Positions Member (1 the time time the 10 Transport At At Normal the the At At
of
2) 9 capacity /cm length a Working pressure (kg .
SECTOR have 2) planned excluded
or 8 /cm )are which long Nominal pressure (kg form km and this installed 30 of PETROLEUM ) an 7 year t/ (cm page Transport than Internal diameter THE the with of . IN ) 000 less (1 ) (J ) end 000 not 6 the 3 (km pressures at Length pipelines than ) working oil footnote less /or 5 (year service see installations 1( and INVESTMENTS not date ning Commissio from P Crude of part work form / or
4 Proposed of of diameters ns
Commence ment Withdrawals scope installations variable the : / by .).
of 3 construction part installatio ,etc Point arrival or of outside pipelines marked under is the plants of installations of service ,temperature undertakings 2 pipelines or Route Point part installations departure from supplying the or viscosity installations for of those (eg persons part route and used the or the projects of withdrawals installations purposes where 1 installation parameters the of routes address military Existing Installations Investment Proposed for part average and Name the A. B. C. D.
Name Pipelines Including State 1 2 3 4 5 ) ) ) ( (2 (3
28 . 4. 73 Official Journal of the European Communities No L 113 /19
- F 4 15
INVEST Remarks
the to of 14 transported Nature products be . ..
19 of 13 Point arrival
January Branches of 1 : 12 of Point State departure as
) (3 Position Member 11 date date ) Maximum
capacity year t/ commissioning commissioning . a 3 reference of of reference (10 the the time time have At excluded 10 the the At planned Transporting Normal are At At ) or SECTOR which form
2) this and 9 km /cm of installed 30 Working pressure (kg an year page t/ the than 2) of PETROLEUM )with 000 8 /cm (1 less end Nominal pressure (kg 500 1 the THE Transport not at of . IN pipelines than 7
Internal diameter footnote less length pressures
) (see not (2 1 product ) P of 6 (km working form Length /or of INVESTMENTS ) installations and Petroleum capacity scope 5 (year part from the date Commissio ning or diameters service outside work 4 Proposed of installations Withdrawals variable plants .). : Commence ment by construction part ,etc installations of / or
3 of marked arrival under is Point exclusively pipelines the installations ,temperature undertakings service of of pipelines or 2 part installations supplying the or from viscosity Route Point of departure for installations those (eg persons and route part used the the or projects of withdrawals installations purposes where
1 installation parameters the routes address military of Existing Installations Investment Proposed part for average and Name the A. B. C. D.
Name Pipelines Including State 1 2 3 4 5 ) ) ) (1 (2 (3
No L 113/20 Official Journal of the European Communities 28 . 4. 73
F 5
INVEST
9
Remarks
.
. noted .. be to 19
also
are 8 January 3 1 : )m Petroleum products (2 refineries of at as State
Capacity oil 7 Position Member installations Crude
Storage ).
form 6 ) this products Petroleum products of (1 3 reservoir SECTOR m of page / the
000 oil of petroleum 5 Number 100 end
and Crude the than at oil PETROLEUM less /
/Distribution footnote THE crude not )
4 of (see IN (year Supply service date Commissioning storing from capacity excluded for a are Proposed 1 3 P work with Withdrawn of form INVESTMENTS of Commencement installations Installations scope / part
the or
outside 2 installations only Location : construction part installations .). or plants of ,etc under
installations supplying service undertakings part installations those ,temperature or or from installations for and
gravity persons part installation or purposes 1 projects specific .the of the installations withdrawals (eg
of military used for Name address Existing Installations Investment Proposed
and intended parameters A. B. C. D.
Tanks State Name 1 * 2 3 4 5 ) ) (1 (2
28 . 4. 73 Official Journal of the European Communities No L 113 /21
.
1 G 16
INVEST Remarks
f) /m
15 calorific (Kcal
Gross value transported
gas 19 ) / /
14 Natural (origin Description January 1 of / /
and as State arrival 13 departure of of
Extension lengthenings Point Point Position Member . 1 capac / .
12 hour ''m stage per 10 Max. in final the / by-products
length 11 a hour as capacity At Maximum per SECTOR transporting only a have /
them 10 year date date GAS transporting with capacity per which Maximum
rence issioning km produce (') and reference refe 30 coram commissioning 9 Maximum hour the the At At which year per At At NATURAL than Maximum ,or installations Transport of 2) less THE 107mV 8 . /cm products not IN Pressure (kg than of energy pressures extensions less ) 7 or (cm not Internal diameter produce of operating not ) ) do /or 6 (2 (km and INVESTMENTS Length installations Installations capacity which
) part 5 or plants diameters (year date ing Commission installations service withdrawals chemical variable work of by 4 part from : Proposed of construction or installations Date
Commence ment of supplying marked under is
those 3 arrival installations of service undertakings and pipelines part installations or pipeline Point from the or for the installations of purposes of of part route persons 2 Route or military the Point projects the departure withdrawals for of installations where
pipelines routes the address 1 Existing Installations Investment Proposed of gas part
and Name installation A. B. C. D.
1 2 Excluding Including Name 3 4 5 ) ) (1 (2
No L 113/22 Official Journal of the European Communities 28 . 4. 73
2 G
INVEST
-
. 8 ..
Remarks 19
1January
of as State
Position Member
7 LNG Origin of .
gas products
SECTOR natural /
value after 3) GAS /m non-energy 6 gas calorific the (Kcal ) liquefied regasification (1 of produce of Gross do
NATURAL which
Transport capacity THE plants 5 - IN importations
Maximum the date date chemical for regasification
reference reference commissioning commissioning supplying LNG the the storage At At of 3) At those Terminals 4 At (m installations INVESTMENTS and capacity part Maximum or purposes
installations military ) 3 part for construction installations (year or service of Commissioning / from
date under
installations installations service undertakings of Proposed or part installations withdrawals from or of 2 for ,excluding work installations
Date LNC persons part of Commencement or projects the withdrawals of installations
importation
1 the address Investment Proposed Existing Installations for Location and A. B. C. D.
1 Terminals Name 2 3 4 5 ) (1
28.4.73 Official Journal of the European Communities No L 113 /23
3 G
INVEST
10
Remarks
19
3 : 9 m daily January " 1 01 Max. on State
3 8 m6 01 Position Member Useful
7 ^ lO Overall mini a ) (2 SECTOR of with 6 ) gas Type 3( reservoir GAS 6/m 10 natural x /
for 150
NATURAL value ) . of Storage /irf 5 THE facilities calorific (Kcal products
IN capacity
Gross storage mum non-energy
) produce 4 service do INVESTMENTS (year installations Underground from date Commissioning which part ).
or / plants dome
Proposed withdrawals 3 work (salt installations of of chemical Commencement construction part Date cavities : installations or of / under supplying
artificial
those 2 installations service and undertakings Location installations ,aquifers part from or or installations for
purposes deposit part gas
persons or projects military of withdrawals natural for installations
1 installation address the of Installations :exhausted Actual Investment Proposed installations and
Name A. B. C. D. example . Name Excluding For
1 2 3 4 5
No L 113 /24 Official Journal of the European Communities 28 . 4. 73
E 1
INVEST ) the (2 of
10 Remarks vicinity
immediate
the 19 in
located
1January entry : 9 temperature ) of (°C stations as State steam turbine of
at
Design exception Positions Member /
the power the with date date of 1) 03 ,and (1 8 capacity reference reference more (') station commissioning commissioning hardcoal the the SECTOR or At At At Fuel storage At and
MW Total stations products 200 . oil of power 7 for
Type cooling ELECTRICITY only of
capacity thermal a THE ) 6 sets required ;method IN (MW are with Nominal capacity per
sets proposed of sets capacity Conventional 5
Number storage capacity identical on Generating INVESTMENTS installations future ) ;data 4 total part fuel (year service or of and date Commissioning from type
installations location each Proposed 3 for : work construction part given of installations Withdrawn line the or Commencement of at
under / separate
installations a service capacity undertakings use
part installations or 2 or from existing installations for ,please Location
persons part plants or applicable the s projects . stallations withdrawals power of in :where refinery or 1 installation multi-fuel address desired the Existing Installation Investment Proposed of mine
of and case A. B. C. D. the Name In supplying Information Name 1 2 3 4 5 ) ) (1 C
28 . 4. 73 Official Journal of the European Communities No L 113/25
E 2
INVEST linked
14 ,being «
Remarks example
;for
unit . .. capa ) single 19 the a 13 of storage pumps (MW city Nominal constitutes 1January : )
of 12 State Storage (GWh station as capacity the
) (2 which Position Member 11 of produ )from Pumped water
annual (GWh distance ty
10 short cibili flow a Average Natural
more over
SECTOR or )
9 sets system MW capacity per (MW Nominal 50 whole stations of the
8 for
sets Number identical ELECTRICITY power of generating capacity a applicable THE ) 7 IN with head (m where Maximum Hydroelectric plant ) capacity flow 6 characteristics (mVs total
Maximum usable Generating future INVESTMENTS installations Hydraulic ) . 5 C part Category proposed or storage . and ) 4 installations (year ,pumped pumps service installed : date ing construction the Commission part installations from of or . of already work under 3 Proposed of period parallel installations ,run-of-the-river in Commence service Withdrawn capacity ment or undertakings part installations storage utilization total or and from ; series or /
course installations in 2 for
annual Location water part influence ,either persons or ,short-term the projects withdrawals proposed of installations storage reservoir
from downstream installation single 1 a address the :seasonal to Existing Installations Investment Proposed derived desired of and Name A. B. C. D. example
For Production Indications hydraulically Name 1 2 3 4 5 ) ) ) ( (2 (3
No L 113 /26 Official Journal of the European Communities 28 . 4. 73
E 3
INVEST 15
Remarks
)
14 trans (MVA Final
19 thermal capacity refer date 13 ing ing the Maximum mission ence commission commission January At 1 : At At
of as State 12
Material
Position Member phase
per 2) 11 conductor (mm
Cross-section per
Conductors
voltage 10 a Number
SECTOR for
9 for Pylons circuits designed designed
of more been or refer ELECTRICITY refer date date 8 Number ing ing the kV the have ence commission commission ence At At THE Transport At At 345 IN they of if 7 for Pylons lines kV designed
Voltage refer refer 6 date date ing ing the the ence commission commission ence . At installations At INVESTMENTS At (') At Transmission pylons of part ) (') 5 line or the (km existing Length on
) installations more or : 4 (year construction part installations service kV date ing or Commission of 345 from of under
Proposed work 3 installations of service voltage undertakings a part Withdrawn or Commence ment installations with from or installations for / cables
the persons 2 part triple
or the Linking stations projects new between withdrawals of of installations
the installation address Investment 1 of Existing Installations Proposed the and Name installation C. D. A. B. covers
Name 1 2 3 4 5 Also (')